Skip to content

Document -

KM strengthens its position in the offshore wind sector with an innovative solution for installation vessels

Kongsberg Maritime (KM) has just signed a new contract with the maritime services and solutions provider MacGregor to deliver a Pile Gripper Guidance System (PGGS) for the OHT Alfa Lift. Scheduled for delivery in 2021, Alfa Lift will be the world’s largest custom-built offshore wind foundation installation vessel
go to media item
License:
Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
File format:
.docx
Download

Related content

Client Newsroom

Welcome to the Saltwater Client Newsroom, a daily updated resource for editors and journalists featuring news releases, images and videos issued on behalf of our international client base. Saltwater is a specialist maritime communications agency working in the superyacht, recreational marine, shipping, offshore, subsea, fishing, renewables and naval sectors. If you are an editor or journalist wishing to receive Saltwater client news releases direct to your inbox, please click or tap the follow button above.

Saltwater